Difficulty

Difficult

Steps

4

Time Required

                          10 - 15 minutes            

Sections

1

  • BIOS Battery
  • 4 steps

Flags

2

Mismatched Prerequisites

This guide does not have a proper prerequisite guide. Help match it to its ideal partner by finding it or writing one!

Needs Better Images

Better photos will improve this guide. Help out by taking, editing, or uploading new ones!

  • BackSony VAIO PCG-3E2L

  • Full Screen

  • Options

  • History

  • Save to Favorites

  • Download PDF

  • Edit

  • Translate

  • Get Shareable Link

  • Embed This Guide

  • Notify Me of Changes

  • Stop Notifications

Introduction

What you need

Step 1

              BIOS Battery               
  • Follow Sony VAIO PCG-3E2L Battery Replacement to the device to remove the battery
  • Follow Sony VAIO PCG-3E2L Hard Drive Replacement to remove the Hard Drive.
  • Follow Sony VAIO PCG-3E2L CD Drive Replacement to remove the CD Drive
  • Follow Sony VAIO PCG-3E2L RAM Replacement to remove memory cover.

Follow Sony VAIO PCG-3E2L Battery Replacement to the device to remove the battery

Follow Sony VAIO PCG-3E2L Hard Drive Replacement to remove the Hard Drive.

Follow Sony VAIO PCG-3E2L CD Drive Replacement to remove the CD Drive

Follow Sony VAIO PCG-3E2L RAM Replacement to remove memory cover.

1024

Step 2

  • Using a #00 Phillips screwdriver, remove the screws

Using a #00 Phillips screwdriver, remove the screws

Step 3

  • Lift the back cover panel.
  • DO NOT force open the back panel.
  • The back cover panel should be lift up easily. If you feel there is resistance, please check if you have all screws removed.

Lift the back cover panel.

DO NOT force open the back panel.

The back cover panel should be lift up easily. If you feel there is resistance, please check if you have all screws removed.

Step 4

  • Use the Plastic Opening Tools to help pop the BIOS Battery.

Use the Plastic Opening Tools to help pop the BIOS Battery.

To reassemble your device, follow these instructions in reverse order.

Cancel: I did not complete this guide.

                                                                                      3 other people completed this guide.                                             

Author

                                      with 1 other contributor 

                    Chengyang Chen                     

Member since: 03/27/2015

918 Reputation

                                      5 Guides authored                  



                       Badges:
                       13







                                                        +10 more badges                           

Team

                       UMass Dartmouth, Team 5-2, Kish Spring 2015                        

                                                  Member of UMass Dartmouth, Team 5-2, Kish Spring 2015 



                    UMASSD-KISH-S15S5G2                     


                                            4 Members                     


                                            10 Guides authored