Difficulty
Easy
Steps
2
Time Required
10 minutes
Sections
1
- The Ninja Master Prep QB900B
- 2 steps
Flags
Action Shots
Be an action hero! This guide needs images that better demonstrate how to perform specific actions.
BackNinja Master Prep QB900B
Full Screen
Options
History
Save to Favorites
Download PDF
Edit
Translate
Get Shareable Link
Embed This Guide
Notify Me of Changes
Stop Notifications
Introduction
What you need
Step 1
The Ninja Master Prep QB900B
- Place the blender to the side.
Place the blender to the side.
1024
Step 2
- Remove the two highlighted screws with a Phillips #2 Screw Driver
- Gently pull off the top.
Remove the two highlighted screws with a Phillips #2 Screw Driver
Gently pull off the top.
To reassemble your device, follow these instructions in reverse order.
Cancel: I did not complete this guide.
One other person completed this guide.
Author
with 1 other contributor
Kamal Taha
Member since: 08/27/2015
679 Reputation
5 Guides authored
Badges:
16
+13 more badges
Team
USF Tampa, Team 1-3, Sullivan Fall 2015
Member of USF Tampa, Team 1-3, Sullivan Fall 2015
USFT-SULLIVAN-F15S1G3
3 Members
5 Guides authored
Keith Johnson - Jul 27, 2021
Reply
My unit has something other than Phillips screws holding the top together. It appears to be an Allen head, not a torx, closest fit was a 2mm Allen wrench but that was still too small. What head could this be?