Difficulty
Moderate
Steps
21
Time Required
30 minutes - 1 hour
Sections
5
- Toro Cement Mixer 68009HD 2018 Safety Precautions
- 5 steps
- Tub
- 7 steps
- Dish
- 4 steps
- Spindle
- 3 steps
- Spindle Bearings
- 2 steps
Flags
0
BackToro Cement Mixer 68009HD (2018)
Full Screen
Options
History
Save to Favorites
Download PDF
Edit
Translate
Get Shareable Link
Embed This Guide
Notify Me of Changes
Stop Notifications
Introduction
Warning: The tub and dish are both extremely heavy and require at least two people to lift them. Be sure to practice safe lifting techniques.
What you need
Step 1
Safety precautions
- Before you begin, press the engine-stop switch to turn off the engine.
Before you begin, press the engine-stop switch to turn off the engine.
1024
Step 2
- Unlatch the three rubber straps securing the cowl.
Unlatch the three rubber straps securing the cowl.
Step 3
- Swing the cowl up until it rests securely on the frame.
Swing the cowl up until it rests securely on the frame.
Step 4
- Slide the fuel cutoff lever to the left to cut the fuel supply to the engine.
Slide the fuel cutoff lever to the left to cut the fuel supply to the engine.
Step 5
- Grab the plastic housing at the end of the spark plug wire.
- Pull firmly to disconnect the wire from the spark plug.
Grab the plastic housing at the end of the spark plug wire.
Pull firmly to disconnect the wire from the spark plug.
Step 6
Remove the tub
- Pull up on the brake lever to disengage the brake.
Pull up on the brake lever to disengage the brake.
Step 7
- Rotate the tub until the yoke and dish assembly sit directly below the tub.
Rotate the tub until the yoke and dish assembly sit directly below the tub.
Step 8
- Push down on the brake lever to re-engage the brake.
- Make sure that the brake is fully engaged.
Push down on the brake lever to re-engage the brake.
Make sure that the brake is fully engaged.
Step 9
- Use a 3/4 inch socket to remove the six nuts securing the tub to the dish.
Use a 3/4 inch socket to remove the six nuts securing the tub to the dish.
Step 10
- Remove the six drum clamp plates from the tub mounting points.
Remove the six drum clamp plates from the tub mounting points.
Step 11
- Lift the tub up slightly by the gear ring to loosen the tub from the dish.
Lift the tub up slightly by the gear ring to loosen the tub from the dish.
Step 12
- The tub is extremely heavy and requires at least two people to lift it. Be sure to practice safe lifting techniques.
- Lift the tub straight up from the dish and remove it from the device.
The tub is extremely heavy and requires at least two people to lift it. Be sure to practice safe lifting techniques.
Lift the tub straight up from the dish and remove it from the device.
Step 13
Remove the dish
- Use a large crescent wrench to remove the bolt securing the dish to the bottom of the yoke.
Use a large crescent wrench to remove the bolt securing the dish to the bottom of the yoke.
Step 14
- Use a 3/4 inch socket to remove the lock bolt from the yoke.
Use a 3/4 inch socket to remove the lock bolt from the yoke.
Step 15
- The dish is extremely heavy and requires at least two people to lift it. Be sure to practice safe lifting techniques.
- Lift the dish straight up and remove it from the yoke.
- A convenient place to set the dish is on top of the removed tub.
The dish is extremely heavy and requires at least two people to lift it. Be sure to practice safe lifting techniques.
Lift the dish straight up and remove it from the yoke.
A convenient place to set the dish is on top of the removed tub.
Step 16
Reassembly tip
- During reassembly, be sure to align the shaft indent with the lock bolt hole as you set the dish in place. Otherwise, you will not be able to properly lock the shaft and tighten the dish bolt.
During reassembly, be sure to align the shaft indent with the lock bolt hole as you set the dish in place. Otherwise, you will not be able to properly lock the shaft and tighten the dish bolt.
Step 17
Remove the spindle
- Use a pipe wrench or an extra-large crescent wrench to loosen the dish plug.
- Remove the dish plug.
Use a pipe wrench or an extra-large crescent wrench to loosen the dish plug.
Remove the dish plug.
Step 18
- The spindle and bearings are very greasy. Handle these components carefully to avoid getting grease everywhere.
- Push the spindle from the bottom of the dish.
The spindle and bearings are very greasy. Handle these components carefully to avoid getting grease everywhere.
Push the spindle from the bottom of the dish.
Step 19
- Pull the spindle from the top of the dish and remove it.
- After you reassemble the device, make sure to follow manufacturer instructions on how to properly lubricate the device with a grease gun.
Pull the spindle from the top of the dish and remove it.
After you reassemble the device, make sure to follow manufacturer instructions on how to properly lubricate the device with a grease gun.
Step 20
Remove the spindle bearings
- Pull and remove the bottom spindle bearing from the bottom of the dish.
Pull and remove the bottom spindle bearing from the bottom of the dish.
Step 21
- Slide the top spindle bearing straight off the spindle and remove it.
Slide the top spindle bearing straight off the spindle and remove it.
To reassemble your device, follow these instructions in reverse order.
Cancel: I did not complete this guide.
Author
Arthur Shi
Member since: 01/03/2018
211,874 Reputation
442 Guides authored
Badges:
46
+43 more badges
Team
iFixit
Member of iFixit
Community
141 Members
15,772 Guides authored