Difficulty
Moderate
Steps
7
Time Required
15 - 30 minutes
Sections
1
- Volume Switch
- 7 steps
Flags
0
BackVTech Learning Tunes Karaoke
Full Screen
Options
History
Save to Favorites
Download PDF
Edit
Translate
Get Shareable Link
Embed This Guide
Notify Me of Changes
Stop Notifications
Introduction
What you need
Step 1
Volume Switch
- To remove the battery door, loosen the screw using a Flathead screwdriver.
- A coin can also be used to loosen the screw.
To remove the battery door, loosen the screw using a Flathead screwdriver.
A coin can also be used to loosen the screw.
1024
Step 2
- Remove the battery door and take out the batteries.
Remove the battery door and take out the batteries.
Step 3
- Remove the six 9.5 mm Phillips #2 screws.
- Remove the six 6.0 mm Phillips #2 screws.
Remove the six 9.5 mm Phillips #2 screws.
Remove the six 6.0 mm Phillips #2 screws.
Step 4
- Gently pull up on the rear panel.
- Be careful to not pull on the wire connections.
- Gently place the back panel underneath the top panel with the tops facing each other, as shown in the picture.
Gently pull up on the rear panel.
Be careful to not pull on the wire connections.
Gently place the back panel underneath the top panel with the tops facing each other, as shown in the picture.
Step 5
- Using a Phillips PH1 screwdriver, remove the two 7.9 mm volume switch board screws.
Using a Phillips PH1 screwdriver, remove the two 7.9 mm volume switch board screws.
Step 6
- Once the screws have been removed, carefully move the volume switch board.
Once the screws have been removed, carefully move the volume switch board.
Step 7
- Carefully desolder the old switch.
- iFixit guide on soldering
Carefully desolder the old switch.
iFixit guide on soldering
To reassemble your device, follow these instructions in reverse order.
Cancel: I did not complete this guide.
Author
with 4 other contributors
Lezette Leuterio
Member since: 02/09/2016
101 Reputation
1 Guide authored
Badges:
5
+2 more badges
Team
USF Tampa, Team 7-2, Cheng Spring 2016
Member of USF Tampa, Team 7-2, Cheng Spring 2016
USFT-CHENG-S16S7G2
4 Members
5 Guides authored